Real projects, in real places — built to last in SEQ.
Every site is different. Different brief, different vegetation, different community.. same outstanding outcomes. Browse the projects below to see how the team approaches hard & softscape, drainage, bio-retention and streetscape upgrades across South East Queensland. Filter by region or service to find work like yours.
No projects match the current filters.
Broadbeach Streetscape Upgrade
Landscape upgrade to road islands and a roundabout in Broadbeach — civil setout, kerbing and paving works combined with structural soil beds and feature planting to deliver a high-amenity median consistent with City of Gold Coast streetscape standards.
- Landscape construction
- Civil setout, kerbing & paving
- Structural planting beds
- Feature & median planting
Carey Park / Southport Parklands Carpark Upgrade
Bio-retention basin and parkland renewal at Carey Park / Southport Parklands — water-sensitive urban design (WSUD) integrated with combined hard & softscape upgrade. Engineered drainage, structural soils and species mixes selected for filtration performance and amenity.
- Bio-retention basin construction
- Water-sensitive urban design (WSUD)
- Engineered structural soil profile
- Native filtration plantings
Bundall Streetscape Upgrade
Hard & softscape upgrade in Bundall — streetscape paving, edge treatments, planting beds and softscape renewal.
- Streetscape hard & softscape upgrade
- Paving and edging works
- Garden bed renewal
- Civil-grade construction tolerances
Remembrance Park Upgrade
Hard & softscape landscape upgrade at Remembrance Park, Surfers Paradise — paving, structural elements, garden bed renewal and high-amenity replanting in a memorial park setting.
- Memorial park renewal
- Hard & softscape landscape upgrade
- Garden bed reconstruction
- High-amenity public realm finish
Surfers Paradise Foreshore Upgrade
Foreshore hard & softscape upgrade along the Surfers Paradise oceanfront — combined paving, edging and resilient coastal softscape suited to a high-traffic public realm with salt and wind exposure.
- Coastal foreshore hard & softscape
- High-traffic public realm finishes
- Salt-tolerant species selection
- Resilient detailing for wind & spray
Brisbane CBD Porous Paving and Tree Grates Installation
Hardscape upgrade in the Brisbane CBD — installation of porous paving systems and city-grade tree grates to support urban tree health, manage stormwater and meet streetscape standards.
- Permeable / porous paving systems
- City-grade tree grate installation
- Stormwater & urban canopy benefits
- CBD-grade traffic-rated finish
Gympie Road Upgrade
Bulk softscape upgrade along the Gympie Road median — converting a deteriorated central reserve into a high-amenity green corridor with resilient mass planting and structural species. Documented before and after.
- Bulk softscape median upgrade
- Mass planting & structural species
- Resilient species mix for road reserves
- Documented before & after outcomes
Ghost Gum Court Upgrade
Landscape and drainage easement upgrade at Ghost Gum Court — engineered drainage works integrated with landscape rehabilitation, restoring access, function and amenity within a residential easement corridor.
- Drainage easement upgrade
- Engineered landscape drainage
- Easement rehabilitation & reinstatement
- Residential corridor amenity restored
Eagles Nest Relocation
Relocation of a very old wedge-tailed eagle's nest measuring 2.8 metres in diameter within a highly protected indigenous area with scar trees and birthing trees in a highly significant location.
- 50 metre all-terrain travel tower and 100-tonne crane
- Bracing, wrapping and aerial rigging of a 1.2-tonne whole-tree canopy from approximately 46 metres high
- Nest relocation using a custom engineered, fabricated nest cradle fitted on top of a newly located 25-metre pole within the bush canopy
- Monitoring using numerous cameras for live-stream data to capture future use of the nest
Renmark Court Tree Hollow and Habitat Creation
Tree pruning services including limb removal, with protection of identified Corella and Lorikeet activity within the upper canopy and Galahs in neighbouring trees. Creation of 5 burrow holes of differing sizes and orientation.
- Retention of 1.5 m – 2.0 m stubs before ringbarking each isolated limb
- Creation of 5 hollows to accommodate habitat
- Monitoring of the frequency and usage of these hollows
- Use of seasoned timber to minimise splitting and shrinkage and increase durability
- 500 mm deep × 120 mm wide hollow with a small ledge to accommodate larger parrot species
New Farm Park Upgrade
Tree replacement of contaminated trees infected with the "Phellinus noxius" pathogen.
- Tree removal of 24 existing dead, diseased or declining trees
- Removal and disposal of diseased soil
- Tree replacement with new ex-ground trees
- 2 years maintenance aftercare
Tedder Ave Upgrade
Renovation of existing raised garden beds.
- Vacuum excavation beneath large trees and water knifing of root systems
- Removal of existing vegetation
- Transplanting of existing advanced trees into new planting areas
- 1 year maintenance aftercare
Fison Avenue Upgrade
Renovation of road median garden beds.
- Traffic control for high vehicle flow area
- Excavation of new garden beds including removal of turf and undesirable existing vegetation
- Installation of understorey planting and ex-ground trees
- 1 year maintenance aftercare
Melbourne Street Upgrade
Renovation of road median garden beds within a high-profile area.
- Underground service location
- Removal of undesirable vegetation
- Night works, advanced tree planting of 40 × ex-ground trees and establishment of new planting beds
- Traffic and pedestrian management
Brisbane 2 Million Trees — Our Urban Forest Program
Installation and maintenance of over 60 revegetation sites, involving the planting of over 2 million trees as part of Brisbane City Council's commitment to make Brisbane a carbon-neutral city.
- Ground preparation including site clearing, rubbish removal, slashing, herbicide application and cultivation
- Tube stock installation including plant preparation, planting, mulching, bagging and staking
- Maintenance including line trimming, mowing, herbicide application, mulching and plant replacement
- Weed management, replacement of missing or vandalised plants, and pick-up and disposal of ground litter
Community Planting and Maintenance Activities
Coordination and delivery of over 200 community planting events and maintenance programs across the Brisbane Region. Predominantly street tree planting works in conjunction with local residents and schools, creating shade corridors and walkable neighbourhoods within the urban environment.
- Preparation of tree planting holes
- Community event coordination including WHS induction and issue of personal protective equipment (PPE)
- Tree planting demonstration, team coordination and guidance during planting works
- Community barbecue and free plant giveaway program
- Post-planting activities including planting technique rectification, mulching, watering and staking
- 1 year maintenance aftercare
Large Norfolk Pine Removals
Tree assessment and removal of large Norfolk Island pines along a high-profile foreshore.
- Pre-works including monitoring and measurement of tree movement and risk assessment to the community
- Liaison with local shop owners and businesses
- Traffic management of car parking, bike lane and footpaths
- Use of 40 metre Elevated Work Platform and cranes to undertake removals
Tradewinds Ave Upgrade
Tree assessment and monitoring of vegetation encroachment, with pest and disease inspections and the establishment of a Visual Tree Assessment (VTA) report.
- Fauna spotter on site whilst working with and around a native bat colony
- Tree pruning and removal including dead wooding, formative pruning, directional pruning and leader reduction
- Weed species removal of vines and understorey
- Coordination and delivery of night-time works
Alexander Headlands Upgrade
Removal of vegetation, weed species and dead species from a cliff face.
- Coordination of works within a high-profile tourist attraction lookout site
- Rigging to concreted posts at high points and lowering down in 5 m – 10 m swings for clearing
- Debris rigged back up the cliff and loaded onto flatbed truck for offsite disposal
- Traffic and pedestrian management
Got a project in
South East Queensland?
Talk to the Rivercity Environmental team about your site, scope and timing. Real people, real depots, real response — every enquiry goes straight to our SEQ ops team.
- 4 SEQ depots
- 26+ years operating
- Same-day reactive